Project

Knights Village Hotel, Warwick Castle

Project Overview

BSB Engineering Services is proud to have supported the delivery of the Knights Village Hotel at Warwick Castle – a major expansion by Merlin Entertainments, enhancing the UK’s heritage-inspired staycation experience with strong sustainability credentials and modern safety systems.

  • Client: Merlin Entertainments
  • Architects: The Manser Practice
  • Main Contractor: RED Construction Group
  • MEP Contractor: One MEP
  • Project Value: £16.4 million
  • Opened: July 2024
  • Sustainability Standards:
    • BREEAM ‘Very Good’ Rating
    • EPC Rating: A
    • 1,000 Trees Planted to offset environmental impact

Blending heritage architecture with contemporary comfort and ecological responsibility, the hotel brings immersive, medieval-themed accommodation to one of the UK’s most visited historic landmarks.

Working closely with One MEP, BSB supplied a complete passive fire protection and HVAC damper control solution, designed to support the sustainability objectives and efficient performance of the hotel.

Our solutions are engineered to meet Approved Document B and BS EN 1366-2 standards, BSB’s fire dampers deliver fail-safe motorised operation, low leakage performance, and are compact for easy integration into confined or themed service zones. Integrated monitoring units provide real-time status updates and system control, while a centralised damper control panel streamlines communication with the building’s BMS—ensuring efficient commissioning, testing, and ongoing compliance.

Why It Matters

In leisure and hospitality projects where family safety, sustainability, and operational reliability are key, BSB’s technical expertise and robust solutions make the difference. By delivering products aligned to strict fire safety legislation and energy-efficient integration,

Need help meeting safety and sustainability goals in your next hospitality or public sector project?

Contact our team: enquiries@bsb-dampers.co.uk

143

FSD-TD Series Motorised Fire Dampers

143

ADM Automatic Damper Monitoring Units

1

ACP150 Addressable Damper Control Panel

Cai Evans, Project Manager, One MEP

“Installation and details issued by BSB were great – we had no issues with cabling or commissioning.”

Similar projects